Expected
Sources |
|
|
Money Provided by School |
$1500 |
|
|
$2000 |
|
|
$1000 |
|
Money or Services Donated |
Cost
of materials and installation |
Listed below are some additional items that will need to be purchased in order to completely install a SkyStream 3.7 turbine. All the wire and conduit prices will vary depending on how far it is from your turbine to the school connection. These items will hopefully be donated by local businesses or utilities. Note: You will not need ALL of the items listed below. Items will be dependent upon the choice of a 240V or 120V connection.
|
Additional Items for Turbine and Tower |
||
|
Qty. |
Material |
Cost |
|
2 |
Copper Grounding Rods (3/4�) |
$30 each |
|
1 |
Tower base fused disconnect box |
$118 |
|
1 |
School disconnect box |
$118 |
|
3 |
AWG 10 turbine electrical wire (80ft) |
|
|
300ft |
120V Turbine Wire |
$214.50 |
|
300ft |
240V Turbine Wire |
$296.70 |
|
Varies |
Steel Electrical conduit |
$11.20 per 10ft length |
|
Varies |
PVC Schedule 40 Electrical conduit |
$6.53 per 10ft length |
|
Varies |
Steel exterior grade electrical conduit |
Varies |
|
Varies |
Turbine interconnection electrical wire (from tower disconnect to school) * |
Varies |
*See Wiring Prices table below.
Below is a table listing approximate
wire prices. The prices will vary
depending on how far it is from the turbine to the school.
The price also changes when using 240V versus
120V. The price does reflect the use of
a contractor and a 30% markup.
|
Wire Prices (installed) |
||
|
Voltage |
Lengths |
Total Cost |
|
120V |
50ft to 500ft |
$14 - $1000 |
|
240V |
50ft to 1000ft |
$20 - $3000 |
The cost of the SkyStream 3.7 is described below. Included is the retail price of the turbine as well as the cost NREL has been given from the SkyStream manufacturers.
|
Turbine Cost Estimates |
|
|
Retail Cost** |
$6000.00 |
|
Non-profit, Schools Discounted Cost |
$3250.00 |
|
|
|
** This is an estimated price.
The actual price will vary from dealer to dealer.
|
70-ft |
||
|
Qty. |
Material |
Cost |
|
Tower |
|
|
|
1 |
Tower Kit (Skystream) |
$894.00 |
|
1 |
Tower Adaptor (Skystream) |
$84.00 |
|
1 |
Lightning Protection Kit (Skystream) |
$50.00 |
|
2 |
3/4"x 12" Eyebolt |
$5.00 |
|
2 |
3/4"x 8" Eyebolt |
$5.00 |
|
|
5" Sch40 Steel Pipe |
$956.00 |
|
|
|
$2000.00 |
|
|
|
|
|
Foundation |
|
|
|
|
Concrete** |
$550.00 |
|
177.5 ft |
Rebar #3 |
$0.18/ft |
|
137.5 ft |
Rebar #4 |
$0.28/ft |
|
20 ft |
Rebar #6 |
$0.63/ft |
|
|
|
|
|
Total Foundation Cost |
|
$633.00 |
|
|
|
|
|
Grand Total for Guyed Tower |
|
$2650.00 |
|
60-ft Monopole & Foundation Cost Estimates (all costs are
rounded) |
||
|
Qty. |
Material |
Cost |
|
Tower |
|
|
|
1 |
60-ft |
6350.00 |
|
1 |
Lightning Protection Kit |
$50.00 |
|
Total Monopole Cost |
|
$6400.00 |
|
|
|
|
|
Foundation |
|
|
|
|
Concrete** |
$500.00 |
|
335 ft |
Rebar #4 |
$0.28/ft |
|
225 ft |
Rebar #8 |
$1.05/ft |
|
|
|
|
|
Total Foundation Cost |
|
$830.00 |
|
|
|
|
|
Grand Total for Monopole |
|
$7250.00 |
|
Additional Equipment Costs |
|
|
Trencher |
$150/day |
|
Electrician |
$30/hour |